District of Carleton North - Route 105 Outfall Replacement
Sector: Cement • Location: Fredericton, New Brunswick, Canada
Source: Dodge USA
The proposed Work involves replacing the existing 1200 mm diameter metal catch basin with a new 2100 mm diameter concrete catch basin. Work also includes placement of riprap to repair the washout located at the outlet of the existing culvert and for slope protection. The roadway within the limits of excavation will be reinstated to the existing condition
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed Work involves replacing the existing 1200 mm diameter metal catch basin with a new 2100 mm diameter concrete catch basin. Work also includes placement of riprap to repair the washout located at the outlet of the existing culvert and for slope protection. The roadway within the limits of excavation will be reinstated to the existing condition |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
