District Office Modular Building
Sector: Road • Location: Bakersfield, California, United States of America
Source: Dodge USA
Fairfax School District is in the process of adding roughly 13,000 square feet of District Office Modular Building space to undeveloped parcel West of the Zephyr Lane Elementary School. The building will be constructed using a slab-ongrade permanent modular construction building system. The building is identified on the attached drawing sheets as New District Office. These drawings are of a schema
- Status
- Closed
- Sector
- Road, Education, Government, Residential, Commercial
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about District Office Modular Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fairfax School District is in the process of adding roughly 13,000 square feet of District Office Modular Building space to undeveloped parcel West of the Zephyr Lane Elementary School. The building will be constructed using a slab-ongrade permanent modular construction building system. The building is identified on the attached drawing sheets as New District Office. These drawings are of a schematic design in nature it is expected that the selected modular company shall prepare appropriate d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Education, Government, Residential, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
