District SCADA Improvements
Bid results · Texas · Last reported Apr 2024
Source: Dodge USA
The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct District SCADA Improvement for Barker-Cypress Municipal Utility District including, but not limited to mobilization, bonds and insurance, permits and all else shown below. Water Plant No. 3: The replacement of existing Autosensory panel; the installation of PLC Panel, HMI and SCADA Server
- Status
- Closed
- Sector
- Water Supply and Storage, Cable car, Chemical (Industrial), Government, Power Transmission, Automotive, Metal, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Telecommunications
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about District SCADA Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct District SCADA Improvement for Barker-Cypress Municipal Utility District including, but not limited to mobilization, bonds and insurance, permits and all else shown below. Water Plant No. 3: The replacement of existing Autosensory panel; the installation of PLC Panel, HMI and SCADA Server tower; the removal of existing chemical analyzer and the installation of ChemScan system. Lakes o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cable car, Chemical (Industrial), Government, Power Transmission, Automotive, Metal, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Telecommunications |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
