Ditching Improvements REBID
Sector: Water Supply and Storage • Location: Bracebridge, Ontario, Canada
Source: Dodge USA
Type of Work: Earth and Rock Ditching to Maintain Positive Drainage with: Hydraulic Gradall with operator, carrier-mounted telescopic boom, wrist action, remote control; minimum Gradall Model G660 2005 or newer including minimum 60 ditching bucket Approximately 75 of contract price. Location: Along Various District of Muskoka Roads
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Bracebridge, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ditching Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Type of Work: Earth and Rock Ditching to Maintain Positive Drainage with: Hydraulic Gradall with operator, carrier-mounted telescopic boom, wrist action, remote control; minimum Gradall Model G660 2005 or newer including minimum 60 ditching bucket Approximately 75 of contract price. Location: Along Various District of Muskoka Roads |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | Bracebridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
