logo
ProjectClosed

Dixie County - Fire Station No. 6 Construction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

This project consists of the construction of a 7,294 SF steel frame building and associated fixtures and equipment as shown in the construction plans. Also included is site development, consisting of but not limited to grading and drainage, asphalt pavement, concrete flat work, concrete curbing and sidewalks, underground utilities, stormwater retention and final dressing and grassing

Status
Closed
Sector
Car parking, Road, Power Transmission, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Steel, Cement, Government, Water Supply and Storage, Metal, Residential, Waste Processing and Treatment
Location
Cross City, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Dixie County - Fire Station No. 6 Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dixie County - Fire Station No. 6 Construction” is an infrastructure initiative in the Car parking sector, located in Cross City, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the construction of a 7,294 SF steel frame building and associated fixtures and equipment as shown in the construction plans. Also included is site development, consisting of but not limited to grading and drainage, asphalt pavement, concrete flat work, concrete curbing and sidewalks, underground utilities, stormwater retention and final dressing and grassing

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Cross City

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Car parking, Road, Power Transmission, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Steel, Cement, Government, Water Supply and Storage, Metal, Residential, Waste Processing and Treatment

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project