Dixie County - Fire Station No. 6 Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project consists of the construction of a 7,294 SF steel frame building and associated fixtures and equipment as shown in the construction plans. Also included is site development, consisting of but not limited to grading and drainage, asphalt pavement, concrete flat work, concrete curbing and sidewalks, underground utilities, stormwater retention and final dressing and grassing
- Status
- Closed
- Sector
- Car parking, Road, Power Transmission, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Steel, Cement, Government, Water Supply and Storage, Metal, Residential, Waste Processing and Treatment
- Location
- Cross City, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dixie County - Fire Station No. 6 Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the construction of a 7,294 SF steel frame building and associated fixtures and equipment as shown in the construction plans. Also included is site development, consisting of but not limited to grading and drainage, asphalt pavement, concrete flat work, concrete curbing and sidewalks, underground utilities, stormwater retention and final dressing and grassing |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Cross City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Power Transmission, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Steel, Cement, Government, Water Supply and Storage, Metal, Residential, Waste Processing and Treatment |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
