Djeno Gas-to-Power Plant
Sector: Power Generation (CCGT) • Location: Republic of Congo
Source: Energy Capital & Power
The Djeno Power Plant, developed by Aksa Enerji, is set to enhance electricity generation in the Republic of Congo with an installed capacity of 50 MW, comprising two combined-cycle combustion turbines of 25 MW each. The first turbine is scheduled to start operations in March 2025, addressing the country's electrification challenges.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind
- Location
- Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- Energy Capital & Power
ConstructChat
Ask ConstructChat about Djeno Gas-to-Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Djeno Power Plant, developed by Aksa Enerji, is set to enhance electricity generation in the Republic of Congo with an installed capacity of 50 MW, comprising two combined-cycle combustion turbines of 25 MW each. The first turbine is scheduled to start operations in March 2025, addressing the country's electrification challenges. |
Original sector | Energy |
Location
Country | Republic of the Congo |
Source
Source | Energy Capital & Power |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
