DJERDAP II HPP REHABILITATION - FIRST PHASE
Under appraisal · Serbia
Source: European Investment Bank (EIB)
An allocation of EPS Green Financing framework loan (2022-0716) to finance the rehabilitation of three hydropower units and related auxiliary and electrical systems by 2030. The powerplant is located inside Iron Gate II dam on the Serbian side of the Danube River.
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Metal, Chemical (Industrial), Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Government, Steel
- Location
- Serbia
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about DJERDAP II HPP REHABILITATION - FIRST PHASE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | An allocation of EPS Green Financing framework loan (2022-0716) to finance the rehabilitation of three hydropower units and related auxiliary and electrical systems by 2030. The powerplant is located inside Iron Gate II dam on the Serbian side of the Danube River. |
Original sector | Energy |
Location
Country | Serbia |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Metal, Chemical (Industrial), Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Government, Steel |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
