Djibouti - Integrated study of urban infrastructure and climate adaptation in the city of Djibouti
Sector: Government • Location: Djibouti
Source: African Development Bank (AfDB)
Integrated study of urban infrastructure and climate adaptation in the city of Djibouti was conceived because of the high level of degradation of the quality of basic infrastructure services that heavily affects the living conditions of urban populations and the willingness of the government to prioritise it. The study will be conducted in two phases. Phase 1 (diagnosis) will comprise a review of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Integrated study of urban infrastructure and climate adaptation in the city of Djibouti was conceived because of the high level of degradation of the quality of basic infrastructure services that heavily affects the living conditions of urban populations and the willingness of the government to prioritise it. The study will be conducted in two phases. Phase 1 (diagnosis) will comprise a review of existing infrastructure development studies and their update, based on the most recent data, including observed and projected climate data, as well as the climate risk and vulnerability assessment. The results of these studies will be crucial for the integrated and streamlined urban development of Djibouti, and more effective and efficient basic urban infrastructure service delivery. Ultimately, this will improve people’s livelihoods and the economy of the city. The study comprises three (3) components, namely: (i) integrated studies with the associated project’s initial environmental and social impact assessment carried out, (ii) institutional support, and (iii) project management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
