Djibouti Power Access and Diversification Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank
The Power Access and Diversification Project for Djibouti aims to (i) increase the access of underserved populations to electricity services, through priority investments, (ii) increase reliability of electricity services, through the development of alternative sources of production and targeted technical assistance; and (iii) improve efficiency of the electricity utility, through technical assist
- Status
- Closed
- Sector
- Road, Solar, Water Supply and Storage, Power Transmission, Biomass, Wind, Geothermal, Power Generation (CCGT), Oil and Gas, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government, Residential
- Location
- Djibouti
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Djibouti Power Access and Diversification Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power Access and Diversification Project for Djibouti aims to (i) increase the access of underserved populations to electricity services, through priority investments, (ii) increase reliability of electricity services, through the development of alternative sources of production and targeted technical assistance; and (iii) improve efficiency of the electricity utility, through technical assistance. The proposed project includes three components: (i) the expansion of electricity distribution covers investments for the extension of the distribution network of Djibouti Ville to reach a number of currently unserved public and residential neighborhoods of Balbala (including PK12), a large low-income area in the Westem outskirts of Djibouti Ville. (ii) introduction of a pilot wind farm near Arta, a small town west of Djibouti Ville that is connected to the capital city's grid. (iii) technical assistance focusing on targeted studies aimed at enhancing sector reliability, efficiency and performance. |
Original sector | FY17 - Energy and Extractives,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Djibouti |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Solar, Water Supply and Storage, Power Transmission, Biomass, Wind, Geothermal, Power Generation (CCGT), Oil and Gas, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government, Residential |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Djibouti
- Horn of Africa Pipeline
- Doraleh Container Terminal S.A.R.L.
- Djibouti Port Truck Staging Area
- Galafi - Yakobi Road
- Djibouti- Road maintenance project
- Djibouti - Water harvesting for water supply and agriculture in rural districts of the Republic of Djibouti
- Djibouti- Road maintenance study project
- Djibouti - Youth Entrepreneurship for Climate Change Adaptation Project (PEJACC)
