DMAF Crescent Beach Utility Improvements Phase 3
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction of approximately 105 metres of 200-250mm dia watermains, 305 metres of 200-375mm dia sanitary sewers, 440 metres of 300-900mm dia perforated & closed wall storm sewers, one storm outfall to a Class A watercourse, new service connections, road and boulevard re-grading with restoration, and 475 linear metres of local and collector roadway improvements with new asphalt and concrete curbs
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Surrey, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DMAF Crescent Beach Utility Improvements Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of approximately 105 metres of 200-250mm dia watermains, 305 metres of 200-375mm dia sanitary sewers, 440 metres of 300-900mm dia perforated & closed wall storm sewers, one storm outfall to a Class A watercourse, new service connections, road and boulevard re-grading with restoration, and 475 linear metres of local and collector roadway improvements with new asphalt and concrete curbs. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Surrey |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
