logo
ProjectEnded

DMC grouting tube system

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

The cost of installation of a typical offshore wind farm is approximately 40% to 50% more than that of an onshore wind farm and one of the main cost components is the underwater foundation. Thus, foundations installation, together with O&M costs, have been identified as interrelated R&D priorities for driving down offshore levelised cost of energy (LCOE) over the next 15 years. The SME behind the

Status
Closed
Sector
Raw Materials, Power Generation (CCGT), Wind, Commercial
Location
Denmark
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about DMC grouting tube system

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “DMC grouting tube system” is an infrastructure initiative in the Raw Materials sector, located in Denmark. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The cost of installation of a typical offshore wind farm is approximately 40% to 50% more than that of an onshore wind farm and one of the main cost components is the underwater foundation. Thus, foundations installation, together with O&M costs, have been identified as interrelated R&D priorities for driving down offshore levelised cost of energy (LCOE) over the next 15 years. The SME behind the DMC GroutTube project, Drechsler Marine Consult (DMC), aims to pursue this major market opportunity by bringing its innovative equipment/concept – DMC GroutTube - for offshore grouting of multi-pile foundations of wind turbines, to commercial maturity through the testing, demonstration and certification of this new grouting system. The novel technology holds a range off clear advantages compared to the traditional grouting method used today. All these benefits provide an estimated grouting cost reduction of 68% (228k€ and 304k€ saved per each tripod and jacket foundations installed, respectively), representing a 3.8% LCOE reduction, per offshore wind turbine installed and doubling the number of foundations grouted per day. These saving represent a major step forward to achieve the goal of 5-11% reductions in LCOE that were set for 2015, which were not yet achieved. Overall, this project opens not only an important economic opportunity for DMC – expecting over €20 million profits, 5 years post-project – but will ultimately lead to a lower overall life cycle costs of offshore wind turbines, as well as reduced environmental impact of installation activities. Therefore, DMC GroutTube will directly contribute to low-cost, low-carbon electricity supply, thus directly addressing this important axis in EU energy strategy.

Location

Country

Denmark

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Raw Materials, Power Generation (CCGT), Wind, Commercial

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project