logo
ProjectEnded

DMX Demonstration in Dunkirk

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

3D project aims mainly at demonstrating DMXTM CO2 Capture technology in AMF’s Dunkirk (FR) steel mill on an industrial pilot plant (0.5 tCO2/hr.), bringing TRL from 4 to 7, with 76% of requested EU budget (14,8M€). DMXTM will give Europe an edge in cost, environmental- and energy-efficient recovery of CO2. Downstream requirements are fully considered in studies of conditioning, transport and stora

Status
Closed
Sector
Commercial, Steel, Manufacturing (Industrial), Oil and Gas, Metal
Location
France
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about DMX Demonstration in Dunkirk

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “DMX Demonstration in Dunkirk” is an infrastructure initiative in the Commercial sector, located in France, Germany, Denmark, Poland, Belgium, Norway, Switzerland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

3D project aims mainly at demonstrating DMXTM CO2 Capture technology in AMF’s Dunkirk (FR) steel mill on an industrial pilot plant (0.5 tCO2/hr.), bringing TRL from 4 to 7, with 76% of requested EU budget (14,8M€). DMXTM will give Europe an edge in cost, environmental- and energy-efficient recovery of CO2. Downstream requirements are fully considered in studies of conditioning, transport and storage in North Sea aquifers. Waste Heat Recovery well combined with DMXTM process will allow reaching unprecedent CO2 Capture cost under 40 €/tCO2. Environmental, societal and stakeholder’s expectations are dealt from the beginning and all-along the project to ensure capability of deploying the CCS cluster on Dunkirk territory. DMXB solvent production will be optimised industrially and environmentally, through LCA. 3D project is based on an EU holistic approach, building on previous an on-going CCS projects where many 3D partners are involved. 2025 full-scale CCS plant of 1 Mt CO2/y will be implemented from end of 3D project which will be an embryo of the future CCS cluster Dunkirk-North Sea 2035 (10 MtCO2/y). It is a major step in the transformation of energy- and CO2-intensive industries such as steel towards EU targets, with opportunities of job creation all along the CO2 CCS chain, notably for Dunkirk region economies and EU storage Hubs. 3D RTD and engineering providers would develop new markets aside from existing Oil & Gas, smoothing environmental and energy-depletion transition. Furthermore, quality of recovered CO2 through DMXTM process is compatible with food-grade markets. The project success relies on of a highly skilled and experienced consortium involving the complete chain of CCS and key transversal skills (LCA, SSH, KPI/TRL/cost assessment). 11 complementary partners from 6 European countries, of 2 academics (ETHZ, DTU), 4 technology providers (AP, GASSCO, IFPEN, UETIKON), 3 engineering companies (AXENS, John Cockerill, BREVIK), 2 end-users (AMF, TotalEnergies OneTech).

Location

Country

France

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Commercial, Steel, Manufacturing (Industrial), Oil and Gas, Metal

Article published date

2025-11-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project