DNT South Queue Warning System IQC
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
NTTA is soliciting sealed bids for a two (2) year contract to procure and install the Queue Warning Detection System which includes Dynamic Message Signs (DMS), installation of an overhead sign bridge, and related ITS infrastructure as shown on the plans. The proposed Queue Warning System will be installed on the southbound direction of the Dallas North Tollway (DNT) between Lemmon Ave and the exi
- Status
- Prospective
- Sector
- Commercial, Road, Government, Bridge
- Location
- Plano, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DNT South Queue Warning System IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NTTA is soliciting sealed bids for a two (2) year contract to procure and install the Queue Warning Detection System which includes Dynamic Message Signs (DMS), installation of an overhead sign bridge, and related ITS infrastructure as shown on the plans. The proposed Queue Warning System will be installed on the southbound direction of the Dallas North Tollway (DNT) between Lemmon Ave and the exit to IH 35E |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Plano |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government, Bridge |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
