Doğancı Tunnel Project
Sector: Road • Location: Orhaneli, Bursa Province, Turkey
Source: Haberler
The Doğancı Tunnel project involved the construction of a 2,344-meter-long single-tube tunnel, a 220-meter-long viaduct, and an at-grade intersection to shorten the passage to the Doğancı Dam by 1,600 meters, reducing travel time from 15 minutes to 3 minutes. The project aims to improve traffic safety, reduce carbon emissions, and stimulate trade and tourism in the Orhaneli and Keles districts.
- Status
- Closed
- Sector
- Road, Bridge, Tunnel, Hydro, Hotel, Government, Water Supply and Storage
- Location
- Orhaneli, Bursa Province, Turkey
- Updated
- 22 Jul 2026
- Source
- Haberler
ConstructChat
Ask ConstructChat about Doğancı Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Doğancı Tunnel project involved the construction of a 2,344-meter-long single-tube tunnel, a 220-meter-long viaduct, and an at-grade intersection to shorten the passage to the Doğancı Dam by 1,600 meters, reducing travel time from 15 minutes to 3 minutes. The project aims to improve traffic safety, reduce carbon emissions, and stimulate trade and tourism in the Orhaneli and Keles districts. |
Original sector | Transport |
Location
Country | Turkey |
State | Bursa Province |
City | Orhaneli |
Source
Source | Haberler |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Tunnel, Hydro, Hotel, Government, Water Supply and Storage |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
