Dock 5-6 Improvements
Sector: Metal • Location: Stockton, California, United States of America
Source: Dodge USA
Improvements to Dock 5-6 will include underwater beam replacement, column repairs, deck repairs, new structural walls, bollard and cleat replacement, and deck surface upgrades. Improvements to Dock 2-6 will include new water vault lids, under dock water lines, new deck curbs, metal panel repair, asphalt dig out and overlay, striping, stair repair, and new high mast lighting system. TWIC required f
- Status
- Prospective
- Sector
- Metal, Road, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Stockton, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dock 5-6 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Improvements to Dock 5-6 will include underwater beam replacement, column repairs, deck repairs, new structural walls, bollard and cleat replacement, and deck surface upgrades. Improvements to Dock 2-6 will include new water vault lids, under dock water lines, new deck curbs, metal panel repair, asphalt dig out and overlay, striping, stair repair, and new high mast lighting system. TWIC required for this project; see item 7 for more information. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Stockton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Road, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
