Dock C Repair & Replacement
Pre-design · Florida · Last reported Aug 2024
Source: Dodge USA
The Marina's major dock area, Dock C, needs to be replaced. The project consists of replacement of the wooden docks and pilings for the main pier (not including finger piers), electrical and potable water services. This is a placeholder and the exact scope and cost are contingent upon the results of the Marina Master Plan.
- Status
- Prospective
- Sector
- Seaport, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
- Location
- Dunedin, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dock C Repair & Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Marina's major dock area, Dock C, needs to be replaced. The project consists of replacement of the wooden docks and pilings for the main pier (not including finger piers), electrical and potable water services. This is a placeholder and the exact scope and cost are contingent upon the results of the Marina Master Plan. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Dunedin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Seaport, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
