Dock Replacement KYU
Sector: Seaport • Location: Vancouver Island, British Columbia, Canada
Source: Dodge USA
The dock must be provided for turnover to Island Health contractors for tug shipment in Fair Harbour. This is inclusive of all required fastening moorings and any other required material or activity for the tug to directly connect to the dock for cartage to Kyuquet. The dock must be ready for shipment when arriving in Fair Harbour to be secured to the tug.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The dock must be provided for turnover to Island Health contractors for tug shipment in Fair Harbour. This is inclusive of all required fastening moorings and any other required material or activity for the tug to directly connect to the dock for cartage to Kyuquet. The dock must be ready for shipment when arriving in Fair Harbour to be secured to the tug. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
