Dock Replacement KYU
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The dock must be provided for turnover to Island Health contractors for tug shipment in Fair Harbour. This is inclusive of all required fastening moorings and any other required material or activity for the tug to directly connect to the dock for cartage to Kyuquet. The dock must be ready for shipment when arriving in Fair Harbour to be secured to the tug.
- Status
- Closed
- Sector
- Seaport, Commercial, Manufacturing (Industrial)
- Location
- Vancouver Island, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dock Replacement KYU
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The dock must be provided for turnover to Island Health contractors for tug shipment in Fair Harbour. This is inclusive of all required fastening moorings and any other required material or activity for the tug to directly connect to the dock for cartage to Kyuquet. The dock must be ready for shipment when arriving in Fair Harbour to be secured to the tug. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Vancouver Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Seaport, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in Canada
- Canada Post Pacific Processing Centre
- Maritime Helicopter Support Facilities - 12 Wing Shearwater
- Residue Storage Areas and Dams
- Long Harbour Processing Plant Site
- Winnipeg Art Galley
- Renforcement du réseau de transport à 315 kV de l’Abitibi‑Témiscamingue
- Modernisation du complexe de Beauharnois‑Les Cèdres
- Marine Use Strategy
