logo

Dodge Flat 150 MW Battery Energy Storage System

Sector: Energy Storage • Location: Washoe County, Nevada, United States

Source: Citizen Portal AI

Project
Planned

A 150-megawatt, four-hour battery energy storage system located adjacent to the existing Dodge Flat Solar Energy Center in the Truckee Canyon planning area. The project covers four parcels totaling roughly 1,400 acres, with about 13 acres developed. It includes 8.1 acres of permanent disturbance, 17.9 acres of temporary disturbance, earthworks involving cut and fill, and 1.2 miles of 34.5 kV colle

Status
Prospective
Sector
Energy Storage, Solar, Commercial
Location
Washoe County, Nevada, United States of America
Updated
22 Jul 2026
Source
Citizen Portal AI

ConstructChat

Ask ConstructChat about Dodge Flat 150 MW Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dodge Flat 150 MW Battery Energy Storage System” is an infrastructure initiative in the Energy Storage sector, located in Washoe County, Nevada, United States. Taiyo aggregates data on it from Citizen Portal AI.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 150-megawatt, four-hour battery energy storage system located adjacent to the existing Dodge Flat Solar Energy Center in the Truckee Canyon planning area. The project covers four parcels totaling roughly 1,400 acres, with about 13 acres developed. It includes 8.1 acres of permanent disturbance, 17.9 acres of temporary disturbance, earthworks involving cut and fill, and 1.2 miles of 34.5 kV collection lines connecting to the existing Dodge Flat substation. The project targets commercial operation in summer 2027 with peak construction lasting about three months and involving roughly 200 workers.

Original sector

Energy

Location

Country

United States of America (USA)

State

Nevada

City

Washoe County

Source

Source

Citizen Portal AI

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Commercial

Article published date

2026-01-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project