Dodoma Integrated and Sustainable Transport Project
Sector: Mass Transit • Location: Tanzania
Source: World Bank Group
The long-term objective of the project is to set Dodoma on a path towards integrated and sustainable (safe, resilient, and green) urban mobility for all users in an effective, efficient and safe manner, contributing to the overall development of the city. Achieving these goals will require addressing a number of challenges regarding institutions (such as a lack of coordination between stakeholders
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The long-term objective of the project is to set Dodoma on a path towards integrated and sustainable (safe, resilient, and green) urban mobility for all users in an effective, efficient and safe manner, contributing to the overall development of the city. Achieving these goals will require addressing a number of challenges regarding institutions (such as a lack of coordination between stakeholders, fragmented data, mode specific institutions, and institutional capacity constraints regarding planning and implementation); regulations (including a lack of integration between land use planning and transport planning, informal public transport systems, and an implicit prioritization of vehicles over other road users); and missing links and bottlenecks in the existing transport infrastructure. In order to address these challenges, the project will support strategic and integrated transport planning, establishment of an institutional enabling environment for urban mobility, and tactical transport infrastructure investments to address missing links and bottlenecks while supporting a sustainable long-term vision. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
