Doe Northeast Water Reclamation System Expansion Phase 3 REB
Sector: Water Supply and Storage • Location: Little Elm, Texas, United States of America
Source: Dodge
Excavation of Aeration Basin Excavation of the Secondary Clarifiers 2A Excavation of the Secondary Clarifiers 2B Excavation of the Splitter Structure Construction of Aeration Basin Piers Construction of Secondary Clarifier 2A Piers Construction of Secondary Clarifier 2B Piers Construction of Splitter Box Piers Installation of the Construction Entrance Installation of the Construction Road Relocati
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Road
- Location
- Little Elm, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Doe Northeast Water Reclamation System Expansion Phase 3 REB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Excavation of Aeration Basin Excavation of the Secondary Clarifiers 2A Excavation of the Secondary Clarifiers 2B Excavation of the Splitter Structure Construction of Aeration Basin Piers Construction of Secondary Clarifier 2A Piers Construction of Secondary Clarifier 2B Piers Construction of Splitter Box Piers Installation of the Construction Entrance Installation of the Construction Road Relocation of the NPW Relocation of the Plant Drain |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Little Elm |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
