Dogan Galata Sah Wind Farm
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Galata Wind Enerji was planning the development of the 93 MW Sah wind farm, near Bandirma, Balikesir province. The project was designed to comprise 31 turbines of 3 MW, producing an annual 333 GWh. Galata Wind Enerji was acquired by Turkish construction group Agaoglu in October 2009.
The project was commissioned in August 2011. Equipment was supplied by Vestas under a supply contract signed in
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
- Location
- Balikesir, Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Dogan Galata Sah Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Galata Wind Enerji was planning the development of the 93 MW Sah wind farm, near Bandirma, Balikesir province. The project was designed to comprise 31 turbines of 3 MW, producing an annual 333 GWh. Galata Wind Enerji was acquired by Turkish construction group Agaoglu in October 2009. The project was commissioned in August 2011. Equipment was supplied by Vestas under a supply contract signed in April 2010. Construction started in September 2010. Galata Wind Enerji was also developing the 30 MW Edincik and 80 MW Tatlipinar wind farms, Balkesir region. As of October 2011, no further details about permits were available. Total expected costs were $147 million. As of October 2011, no further details about the financial structure of the project were available. In July 2012, the project was acquired by Dogan Enerji Yatirimlari, subsidiary of Dogan Holding (IST: DOHOL). Total price was EUR 171.4 million (US$ 222.8 million). SeeNews Renewables, Dogan Enerji closes buy of 126 MW of wind farms from Agaoglu, 5 July 2012. |
Original sector | Energy |
Budget |
Location
Country | Turkey |
State | Balikesir |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
