Dogger Bank South Offshore Wind Project
Sector: Wind • Location: United Kingdom
Source: IndexBox
The Dogger Bank South offshore wind project consists of two separate farms, Dogger Bank South West and Dogger Bank South East, with a combined planned installed capacity of 3 GW. The project is located over 100 kilometers off the northeast coast of England. RWE and Masdar, who own the project, plan to carry out detailed final design work and procurement, aiming for a final investment decision in 2
- Status
- Prospective
- Sector
- Wind
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- IndexBox
ConstructChat
Ask ConstructChat about Dogger Bank South Offshore Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dogger Bank South offshore wind project consists of two separate farms, Dogger Bank South West and Dogger Bank South East, with a combined planned installed capacity of 3 GW. The project is located over 100 kilometers off the northeast coast of England. RWE and Masdar, who own the project, plan to carry out detailed final design work and procurement, aiming for a final investment decision in 2027 and commissioning in 2031 and 2032. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
Source
Source | IndexBox |
URL |
More Details
Record type | Project |
Sector | Wind |
Article published date | 2026-05-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
