DOI Wind and Solar Energy Project Permitting Review
Sector: Wind • Location: United States
Source: U.S. Senator Michael Bennet (.gov)
The Department of the Interior (DOI) issued a Secretarial order requiring the Secretary's personal approval for routine permitting decisions related to wind and solar energy projects. This new policy introduces multiple layers of bureaucratic review, potentially delaying or blocking low-cost wind and solar energy projects on federal, state, and private lands, affecting ongoing and future projects.
- Status
- Prospective
- Sector
- Wind, Solar, Government
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- U.S. Senator Michael Bennet (.gov)
ConstructChat
Ask ConstructChat about DOI Wind and Solar Energy Project Permitting Review
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Department of the Interior (DOI) issued a Secretarial order requiring the Secretary's personal approval for routine permitting decisions related to wind and solar energy projects. This new policy introduces multiple layers of bureaucratic review, potentially delaying or blocking low-cost wind and solar energy projects on federal, state, and private lands, affecting ongoing and future projects. |
Original sector | Energy |
Location
Country | United States of America (USA) |
Source
Source | U.S. Senator Michael Bennet (.gov) |
URL |
More Details
Record type | Project |
Sector | Wind, Solar, Government |
Article published date | 2025-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States
- Union Power Project El Dorado AR
- I-485 Charlotte Outer Loop, North Carolina
- Goethals Bridge Replacement Project, New York
- Northeast Supply Enhancement (NESE) Project
- Dominion Cove Point Liquefaction Project, Chesapeake Bay
- Starbucks Coffee Roasting Plant
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
