Doicești Small Modular Nuclear Power Plant
Sector: Nuclear • Location: Doicești, Romania
Source: Romania Insider
The Doicești SMR project involves the installation of 6 small modular nuclear reactors, each with an installed capacity of 77 MW, producing a total of 462 MW of baseload power with a capacity factor over 95%. The project is currently in Phase 2 of design and feasibility studies, with extensive site preparation and remediation works completed at the former coal-fired power plant site.
- Status
- Prospective
- Sector
- Nuclear, Power Generation (CCGT)
- Location
- Doicești, Romania
- Updated
- 22 Jul 2026
- Source
- Romania Insider
ConstructChat
Ask ConstructChat about Doicești Small Modular Nuclear Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Doicești SMR project involves the installation of 6 small modular nuclear reactors, each with an installed capacity of 77 MW, producing a total of 462 MW of baseload power with a capacity factor over 95%. The project is currently in Phase 2 of design and feasibility studies, with extensive site preparation and remediation works completed at the former coal-fired power plant site. |
Original sector | Energy |
Location
Country | Romania |
City | Doicești |
Source
Source | Romania Insider |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT) |
Article published date | 2025-12-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Romania
- Cernavoda 2
- Cernavoda 5
- Rapid intervention force to chemical, biological, radiological and nuclear emergencies on the Danube river
- Danube WATER integrated management
- Regional Center for Training and Monitoring of the Environmental Impact of Electrical Installations
- Improvement of the transport safety in the common Bulgarian-Romanian stretch of the Danube river through development of the emergency response by cross-border cooperation
- Cernavoda 3
- Cernavoda 1
