logo

Dokwe Gold Project Pre-Feasibility Study Update

Sector: Mining • Location: Zimbabwe

Source: UK Investor Magazine

Project
Planned

Ariana Resources has updated its pre-feasibility study for the Dokwe gold project in Zimbabwe, showing a post-tax NPV10 of $740 million at a gold price of $4,250/ounce. Ore reserves increased by 42% to 1.13 million ounces, with total pre-production capital expenditure estimated at $163.9 million.

Status
Prospective
Sector
Mining
Location
Zimbabwe
Updated
22 Jul 2026
Source
UK Investor Magazine

ConstructChat

Ask ConstructChat about Dokwe Gold Project Pre-Feasibility Study Update

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dokwe Gold Project Pre-Feasibility Study Update” is an infrastructure initiative in the Mining sector, located in Zimbabwe. Taiyo aggregates data on it from UK Investor Magazine.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ariana Resources has updated its pre-feasibility study for the Dokwe gold project in Zimbabwe, showing a post-tax NPV10 of $740 million at a gold price of $4,250/ounce. Ore reserves increased by 42% to 1.13 million ounces, with total pre-production capital expenditure estimated at $163.9 million.

Original sector

Mining

Budget

Location

Country

Zimbabwe

Source

Source

UK Investor Magazine

URL

More Details

Record type

Project

Article published date

2026-05-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project