Dollar Tree TI Charleston SC
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Exterior:1.remove Previous Tenants Sign,patch, Paint Facade.2.remove Previous Tenants Branding, Install New Branding3.install New Accessibility Decals4.power Wash / Paint Facade As Requiredsales Floor:1.remove Any Fixtures Left Behind By Previous Tenant2.remove Shelving3.demo Previous Branding4.repair Exist Auto Doors5.rekey Exist Front Doors6.keep Exist Flooring And Strip / Wax / Polish7.install
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential
- Location
- Charleston, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dollar Tree TI Charleston SC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Exterior:1.remove Previous Tenants Sign,patch, Paint Facade.2.remove Previous Tenants Branding, Install New Branding3.install New Accessibility Decals4.power Wash / Paint Facade As Requiredsales Floor:1.remove Any Fixtures Left Behind By Previous Tenant2.remove Shelving3.demo Previous Branding4.repair Exist Auto Doors5.rekey Exist Front Doors6.keep Exist Flooring And Strip / Wax / Polish7.install Walk-off Mat8.retrofit Lamps9.repair Or Install Exit Lighting10.keep Open Deck11.keep Exist Ductw... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Charleston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
