Dollyhyde Road Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Bridge No. F08-12. This project will replace the concrete bridge deck and steel beams and bearings on the Dollyhyde Road Bridge over North Fork Linganore Creek. The 2021 ADT at the bridge is 171 vehicles per day. The County of Frederick may be seeking a consultant to prepare architecture and engineering services for Dollyhyde Road Bridge Replacement Project.
- Status
- Prospective
- Sector
- Commercial, Government, Steel, Bridge, Cement, Automotive, Road, Metal
- Location
- Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dollyhyde Road Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge No. F08-12. This project will replace the concrete bridge deck and steel beams and bearings on the Dollyhyde Road Bridge over North Fork Linganore Creek. The 2021 ADT at the bridge is 171 vehicles per day. The County of Frederick may be seeking a consultant to prepare architecture and engineering services for Dollyhyde Road Bridge Replacement Project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Steel, Bridge, Cement, Automotive, Road, Metal |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
