Dolovo Wind

Sector: Raw Materials • Location: Serbia

Source: International Finance Corporation (IFC)

    The proposed investment is IFC A loan of up to EUR 60 million, MCPP loan of up to 
    EUR 45 million and B loans of up EUR 25 million to 
    Vetroelektrane Balkana d.o.o. (the “Company”), a limited liability company incorporated in Serbia. 
    The project was originally developed by Continental Wind Partners LLP (CWP), a US-based independent power producer with prove
Status
Closed
Sector
Raw Materials, Road, Water Supply and Storage, Wind, Government, Power Generation (CCGT), Commercial
Location
Serbia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Dolovo Wind

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dolovo Wind” is an infrastructure initiative in the Raw Materials sector, located in Serbia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Company

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment is IFC A loan of up to EUR 60 million, MCPP loan of up to  EUR 45 million and B loans of up EUR 25 million to  Vetroelektrane Balkana d.o.o. (the “Company”), a limited liability company incorporated in Serbia.  The project was originally developed by Continental Wind Partners LLP (CWP), a US-based independent power producer with proven experience in wind energy project development in Central and Eastern Europe.  The principal project sponsor is Abu Dhabi Future Energy Company PJSC (Masdar), a commercially driven renewable energy company established in 2006 by the Government of Abu Dhabi.  Masdar is wholly owned by Mubadala Investment Company (Mubadala), a sovereign wealth fund established and owned by the Government of Abu Dhabi with a strategic role in diversifying country's economy.    The project consists of the construction, operation and maintenance of a 158 MW wind farm and ancillary facilities (a 35/400 kV sub-station, a 10.8 km long 400 kV power line, an underground medium-voltage power cable network connecting the turbines with the sub-station, a network of access roads and a control building) in the Municipality of Kovin in Serbia. The project will be constructed by an Engineering, Procurement and Construction (EPC) contract arrangement with General Electric Wind Energy GmbH (GE)   and General Electric International – branch Serbia  that will manage all construction activities on behalf of the company. The European Bank for Reconstruction and Development (EBRD) will be a lender to the project alongside IFC.   The proposed site is located about 30 km to the north east of Belgrade and covers an area of approximately 3,700 ha on reasonably flat terrain with ground elevations ranging between 127 m and 150 m above sea level. The land is in agricultural use and is intensively farmed. The Special Nature Reserve (SNR) Deliblato Sands, an Important Bird Area (IBA), is located 1.3 km east of the proposed wind farm site. The local area is sparsely populated, with the nearest village (Dolovo) located 2 km to the south west, Mramorak located 1.1 km to the south, Vladimirovac located 2.5 km to the north and the weekend settlement of Devojacki Bunar located 1.5 km to the north east of the wind farm boundary.      The project comprises 57 GE 2.78 MW wind turbines. The turbine rotor diameter of this model is 120 m, with a hub height of 110 m. A number of proposed and/or anticipated wind power plants are located within a 30 km radius of the the project site, namely Alibunar 1 (172 MW), Alibunar (42 MW), Malialibunar (8MW), Cibuk 2 (160 MW), Bela Anta (120 MW), Kosava (120 MW), and Kovacica (125 MW).      The proposed site is located in an area designated for wind farm development under the Spatial Plan of the Municipality of Kovin. The wind farm design and development schemes have followed the requirements of the Detailed Plan of Regulation adopted by the Municipality of Kovin in 2010. The company has purchased 65% of the land from private individuals and the remaining 35% from the Municipality of Kovin at market rates on a willing-buyer, willing-seller basis. The land acquisition is not expected to involve any economic or physical displacement of people, although a Land Acquisition Plan was prepared in 2014 in case involuntary resettlement became necessary.    The project will be an independent power producer (“IPP”) and all the output generated will be sold to the country’s single buyer, Electric Power Company of Serbia, under a 12 year Power Purchase Agreement (“PPA”). Construction of the project commenced in 2017 and commercial operations are expected to begin by the end of 2018, including completion of the 400 kV overhead power line.

Original sector

V-BC - Wind Power - Renewable Energy Generation

Location

Country

Serbia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Road, Water Supply and Storage, Wind, Government, Power Generation (CCGT), Commercial

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project