Domain / Kimpton Hotel
Design development · Utah · Last reported Jul 2025
Source: Dodge
The project is on a 1.25 acre site. This new building to be constructed will have 10-levels. The first floor will be a concrete podium to house the main functions of the hotel and will include most of the public space. Floors 2-9 are for all the Hotel Rooms. Floor Level 10 will have a restaurant. This project is a Concrete and Infinity System Project.
- Status
- Prospective
- Sector
- Raw Materials, Hotel, Commercial, Steel, Cement, Consumer Products
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Domain / Kimpton Hotel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project is on a 1.25 acre site. This new building to be constructed will have 10-levels. The first floor will be a concrete podium to house the main functions of the hotel and will include most of the public space. Floors 2-9 are for all the Hotel Rooms. Floor Level 10 will have a restaurant. This project is a Concrete and Infinity System Project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Hotel, Commercial, Steel, Cement, Consumer Products |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
