logo
ProjectCancelled

Dominant Resource Efficiency

Cancelled · Russia

Source: European Bank for Reconstruction and Development (EBRD)

Translated version of this PSD: Russian The EBRD is considering USD 78.0 million (or RUB equivalent) loan to Dominant Group (“Dominant”), one of the largest sugar producers in Russia also involved in dairy and primary agriculture.

	The loan will primarily finance modernisation of sugar plants, including energy efficiency improvements and purchase of modern agricultural machinery with lower fuel 
Status
Closed
Sector
Consumer Products, Raw Materials, Residential, Government
Location
Russia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Dominant Resource Efficiency

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dominant Resource Efficiency” is an infrastructure initiative in the Consumer Products sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Translated version of this PSD: Russian The EBRD is considering USD 78.0 million (or RUB equivalent) loan to Dominant Group (“Dominant”), one of the largest sugar producers in Russia also involved in dairy and primary agriculture. The loan will primarily finance modernisation of sugar plants, including energy efficiency improvements and purchase of modern agricultural machinery with lower fuel consumption and carbon emissions (the “Project”). The Project’s transition impact potential will derive from demonstration of new replicable behaviour and activities and setting standards for corporate governance and business conduct. In particular, the group will as a result increase efficiency in sugar beet farming and reduce energy and resource intensity of its processing facilities through modernisation of its equipment and introduction of energy and resource-saving management practices. Dominant. USD 78.0 million (or RUB equivalent) loan for the account of EBRD. Approximately USD 130.8 million. Categorised B. Independent consultants were employed, in accordance with a Terms of Reference (TOR) provided by the Bank, to undertake a number of tasks including a corporate review of environmental, health and safety management, E&S audits of those facilities utilising EBRD funding, BAT assessments for both existing operations and the modernization programme and to develop an Environmental and Social Action Plan (ESAP) and a Stakeholder Engagement Plan as necessary to ensure that the Company will comply with the Bank’s PRs. The key findings from the E&S due diligence are that there are no significant adverse environmental or social impacts associated with the operations of the company. However, there are a number of issues which will need to be addressed by the Company to ensure compliance with the Bank’s PRs. The Company does not have a formalised EHS management system for the group nor staff specifically nominated for the management of environmental issues. There are a number of people living within the sanitary protection zones of the various facilities, and the Company needs to manage issues in relation to dust management and discharge of waste waters to filtration fields. There are a number of minor issues in relation to health and safety particularly for the use of contractors on Company sites. No major labour or social issues were identified although the Company has not undertaken a formal identification of key stakeholders nor developed a communication strategy for communicating with them. A draft Environmental and Social Action Plan has been developed, to ensure the project meets the Bank’s PRs, and this will be finalised and agreed with the Company prior to Board approval of the project. The ESAP is designed to address the key issues identified during due diligence and includes sections on corporate actions for EHS management and actions specific to each facility. At the corporate level these actions include the development of a EHS management system including a staffing structure, the establishment of KPIs, measurement of the Company’s activities against BAT and development of more formalised reporting. Actions for individual facilities include actions to compliment the development of systems at the corporate level and individual actions in response to specific risks identified during the auditing process. The Company will be required to provide annual reporting to EBRD on the implementation of the ESAP and on any other EHS issues arising during the year. Energy efficiency audit funded under the Global Environmental Facility (GEF) funded framework for Russia. Ekaterina Chistilina Tel: +7 (495) 745 50 73 E-mail: e.chistilina@dominantsugar.ru

Original sector

Food and Agribusiness

Location

Country

Russia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Consumer Products, Raw Materials, Residential, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project