logo

Don Mario Oxide Stockpile Project

Sector: Metal • Location: Bolivia

Source: PR Newswire

Project
Delayed

The Don Mario Oxide Stockpile Project (OSP) involves the commissioning and integration of copper leaching, solvent extraction, and electro-winning circuits at the Don Mario plant operated by EMIPA in Bolivia. The project aims to commence oxide ore processing but is currently delayed due to transport and logistics disruptions caused by civil unrest in Bolivia.

Status
Failure
Sector
Metal, Warehouse
Location
Bolivia
Updated
22 Jul 2026
Source
PR Newswire

ConstructChat

Ask ConstructChat about Don Mario Oxide Stockpile Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Don Mario Oxide Stockpile Project” is an infrastructure initiative in the Metal sector, located in Bolivia. Taiyo aggregates data on it from PR Newswire.

Participants

Not available for this record.

Status

Original status

delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Don Mario Oxide Stockpile Project (OSP) involves the commissioning and integration of copper leaching, solvent extraction, and electro-winning circuits at the Don Mario plant operated by EMIPA in Bolivia. The project aims to commence oxide ore processing but is currently delayed due to transport and logistics disruptions caused by civil unrest in Bolivia.

Original sector

Mining & Metals

Location

Country

Bolivia

Source

Source

PR Newswire

URL

More Details

Record type

Project

Sector

Metal, Warehouse

Article published date

2026-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project