Dona Francisca Hydroelectric Power Project

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

Dona Francisca Energetica was awarded the contract to build, own and operate the power plant for a 35-year period (possible extensions of this period are foreseen in the contract). The project involves a 125-MW hydro power plant and a 2.5 KM transmission line, amounting to an investment of US$ 90 million. Financing was achieved with equity from the sponsors (35% of the total cost) and with resourc

Project Information FAQ

Project Information

4 Q
The project “Dona Francisca Hydroelectric Power Project” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dona Francisca Energetica was awarded the contract to build, own and operate the power plant for a 35-year period (possible extensions of this period are foreseen in the contract). The project involves a 125-MW hydro power plant and a 2.5 KM transmission line, amounting to an investment of US$ 90 million. Financing was achieved with equity from the sponsors (35% of the total cost) and with resources from the IADB, the state-owned bank BNDES, and Bradesco. The financing package from the IADB was awarded in Jan. 2001 and consisted of US$ 10 million as direct loan and US$ 37 million syndication. The project is being developed as a joint-venture of the following companies: Inepar (30%), Gerdau (21.8%), the partially privatized company Copel (23%), the state-owned company Celesc (23%) and Desenvix (2%). The concession contract was signed in Aug. 1998, but construction works started only in Aug. 2000. In Jan. 2001, the first unit of the plant, with capacity of 62.5 MW started operating.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data