logo

Dona Francisca Hydroelectric Power Project

Sector: Commercial • Location: Rio Grande Do Sul, Brazil

Source: World Bank Group

Project
Active

Dona Francisca Energetica was awarded the contract to build, own and operate the power plant for a 35-year period (possible extensions of this period are foreseen in the contract). The project involves a 125-MW hydro power plant and a 2.5 KM transmission line, amounting to an investment of US$ 90 million. Financing was achieved with equity from the sponsors (35% of the total cost) and with resourc

Status
Prospective
Sector
Commercial, Hydro, Power Generation (CCGT), Government
Location
Rio Grande Do Sul, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dona Francisca Hydroelectric Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dona Francisca Hydroelectric Power Project” is an infrastructure initiative in the Commercial sector, located in Rio Grande Do Sul, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Dona Francisca Energetica was awarded the contract to build, own and operate the power plant for a 35-year period (possible extensions of this period are foreseen in the contract). The project involves a 125-MW hydro power plant and a 2.5 KM transmission line, amounting to an investment of US$ 90 million. Financing was achieved with equity from the sponsors (35% of the total cost) and with resources from the IADB, the state-owned bank BNDES, and Bradesco. The financing package from the IADB was awarded in Jan. 2001 and consisted of US$ 10 million as direct loan and US$ 37 million syndication. The project is being developed as a joint-venture of the following companies: Inepar (30%), Gerdau (21.8%), the partially privatized company Copel (23%), the state-owned company Celesc (23%) and Desenvix (2%). The concession contract was signed in Aug. 1998, but construction works started only in Aug. 2000. In Jan. 2001, the first unit of the plant, with capacity of 62.5 MW started operating.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

State

Rio Grande Do Sul

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Hydro, Power Generation (CCGT), Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project