Dona Julia
Sector: Geothermal • Location: Costa Rica
Source: World Bank Group
The Dona Julia Hydroelectric Project is a run of the river, 18-MW project located in Horquetas de Sarapiqui, Heredia. The company sponsors are the ERI Services Facilities Management Group (24%) and local partners. The project, which costs US$ 34 million, consists of a reservoir for the storage and discharge of water consistent with peak energy requirements of ICE.
From the total cost, US $24.8
- Status
- Prospective
- Sector
- Geothermal, Water Supply and Storage, Power Generation (CCGT), Commercial, Hydro, Manufacturing (Industrial), Government
- Location
- Costa Rica
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Dona Julia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dona Julia Hydroelectric Project is a run of the river, 18-MW project located in Horquetas de Sarapiqui, Heredia. The company sponsors are the ERI Services Facilities Management Group (24%) and local partners. The project, which costs US$ 34 million, consists of a reservoir for the storage and discharge of water consistent with peak energy requirements of ICE. From the total cost, US $24.8 million were financed by long-term loans from DEG (US$13.8 million) and Scotia Mercantile Bank, a subsidiary of the Bank of Novia Scotia (US $10.2 million). In addition, US$ 5 million of the loan were provided by Dresdner Bank Lateinamerika AG as part of an A/B loan syndication. MIGA, in turn, provided an US$ 11.4 million guarantee in 1998 to ERI Holdings and Scotia Mercantile Bank for their equity investment and loan, respectively, to the project. Electricity generated will be sold to ICE under a standard 15-year power purchase agreement. The annual generation in an average year will be between 83 GWh and 87.8 GWh during peak energy demand, displacing 20-MW thermal units of ICE that do not meet environmental standards. |
Original sector | Energy |
Budget |
Location
Country | Costa Rica |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Water Supply and Storage, Power Generation (CCGT), Commercial, Hydro, Manufacturing (Industrial), Government |
Article published date | 2024-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
