Dona Julia
Sector: Geothermal • Location: Heredia, Costa Rica
Source: World Bank Group
The Dona Julia Hydroelectric Project is a run of the river, 18-MW project located in Horquetas de Sarapiqui, Heredia. The company sponsors are the ERI Services Facilities Management Group (24%) and local partners. The project, which costs US$ 34 million, consists of a reservoir for the storage and discharge of water consistent with peak energy requirements of ICE.
From the total cost, US $24.8
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Dona Julia Hydroelectric Project is a run of the river, 18-MW project located in Horquetas de Sarapiqui, Heredia. The company sponsors are the ERI Services Facilities Management Group (24%) and local partners. The project, which costs US$ 34 million, consists of a reservoir for the storage and discharge of water consistent with peak energy requirements of ICE. From the total cost, US $24.8 million were financed by long-term loans from DEG (US$13.8 million) and Scotia Mercantile Bank, a subsidiary of the Bank of Novia Scotia (US $10.2 million). In addition, US$ 5 million of the loan were provided by Dresdner Bank Lateinamerika AG as part of an A/B loan syndication. MIGA, in turn, provided an US$ 11.4 million guarantee in 1998 to ERI Holdings and Scotia Mercantile Bank for their equity investment and loan, respectively, to the project. Electricity generated will be sold to ICE under a standard 15-year power purchase agreement. The annual generation in an average year will be between 83 GWh and 87.8 GWh during peak energy demand, displacing 20-MW thermal units of ICE that do not meet environmental standards. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
