Dona Julia

Sector: Water Supply and Storage • Location: Costa Rica

Source: World Bank Group

Project
Active

The Dona Julia Hydroelectric Project is a run of the river, 18-MW project located in Horquetas de Sarapiqui, Heredia. The company sponsors are the ERI Services Facilities Management Group (24%) and local partners. The project, which costs US$ 34 million, consists of a reservoir for the storage and discharge of water consistent with peak energy requirements of ICE.

From the total cost, US $24.8

Project Information FAQ

Project Information

5 Q
The project “Dona Julia” is an infrastructure initiative in the Water Supply and Storage sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dona Julia Hydroelectric Project is a run of the river, 18-MW project located in Horquetas de Sarapiqui, Heredia. The company sponsors are the ERI Services Facilities Management Group (24%) and local partners. The project, which costs US$ 34 million, consists of a reservoir for the storage and discharge of water consistent with peak energy requirements of ICE. From the total cost, US $24.8 million were financed by long-term loans from DEG (US$13.8 million) and Scotia Mercantile Bank, a subsidiary of the Bank of Novia Scotia (US $10.2 million). In addition, US$ 5 million of the loan were provided by Dresdner Bank Lateinamerika AG as part of an A/B loan syndication. MIGA, in turn, provided an US$ 11.4 million guarantee in 1998 to ERI Holdings and Scotia Mercantile Bank for their equity investment and loan, respectively, to the project. Electricity generated will be sold to ICE under a standard 15-year power purchase agreement. The annual generation in an average year will be between 83 GWh and 87.8 GWh during peak energy demand, displacing 20-MW thermal units of ICE that do not meet environmental standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data