logo

Donahue Street Portable Pump Station

Sector: Water Supply and Storage • Location: California, United States of America

Source: Marin County Department of Public Works (DPW)

Project
Active

The functional benefit will be a reduction in the depth and duration of flooding on Donahue Street and the Highway 101 ramps (which are owned and maintained by California Department of Transportation). The improvements will allow vehicle access following storms to return faster than before. However, the portable pump station’s system will not be large enough to fully prevent roadway flooding at th

Project Information FAQ

Project Information

5 Q
The project “Donahue Street Portable Pump Station” is an infrastructure initiative in the Water Supply and Storage sector, located in California, United States of America. Taiyo aggregates data on it from Marin County Department of Public Works (DPW).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The functional benefit will be a reduction in the depth and duration of flooding on Donahue Street and the Highway 101 ramps (which are owned and maintained by California Department of Transportation). The improvements will allow vehicle access following storms to return faster than before. However, the portable pump station’s system will not be large enough to fully prevent roadway flooding at the location after storms and high tides. This is a first step in a series of projects in Marin City, and more improvements are planned to further reduce the flooding on Donohue. This project includes constructing two temporary, underground sumps with two trailer-mounted portable pumps, and connecting the existing storm drainage system along Donahue Street to the sumps via new drainage structures and pipes. The portable pumps are intended to be deployed prior to significant storms and pump stormwater through two pipes approximately 1,400 feet to the Marin City Pond. The stormwater will then be discharged from the pond, located northeast of the Gateway Shopping Center, into Richardson Bay. The portable pump station project is designed to reduce the severity of localized flooding along Donahue Street, a key thoroughfare in the unincorporated neighborhood that has been chronically impacted by roadway flooding during storms and high tides. Marin City, which is adjacent to Richardson Bay, often becomes flooded during heavy storms, especially when those storms coincide with high tides. The localized flooding impacts Donahue Street and impedes access to the Highway 101 ramps, restricting mobility for Marin City residents and visitors who must wait until the stormwater slowly drains out to Richardson Bay after a storm.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data