logo

Donald Cameron Centre

Sector: Cement • Location: Canada

Source: Bird Construction

Project
Unknown

Recognizing the potential for considerable cost savings for the client, Bird raised the existing building by three feet to allow the centre’s addition to be built on grade. This increase also brought it closer to the neighbouring Kinnear Centre elevation, thereby eliminating the need for costly grade separation considerations. The significant undertaking required internal bracing and frame work wh

Project Information FAQ

Project Information

3 Q
The project “Donald Cameron Centre” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Recognizing the potential for considerable cost savings for the client, Bird raised the existing building by three feet to allow the centre’s addition to be built on grade. This increase also brought it closer to the neighbouring Kinnear Centre elevation, thereby eliminating the need for costly grade separation considerations. The significant undertaking required internal bracing and frame work while hydraulic jacks were used to lift the structure. As numerous design changes were incorporated into the scope of work, the Bird team expedited construction by extending work hours and increasing man power to ensure the initial completion date was reached. Bird not only saved the building from demolition but reused the original stone foundation for landscaping while regional building materials and sustainable certified wood were used for the 5,800 square foot building addition. The building is LEED Gold Certified.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data