Donalda to Bawlf Waterline Phase 7
Sector: Government • Location: Stettler, Alberta, Canada
Source: Dodge
The work comprises of, but is not limited to the installation and commissioning of approximately 49km of directionally drilled regional water pipeline, along with all appurtenances as is detailed on the SMRWSC Phase 7 - Donalda to Bawlf Waterline Design Drawings, and as specified in the contract documents.
- Status
- Closed
- Sector
- Government, Waste Processing and Treatment, Commercial, Water Supply and Storage
- Location
- Stettler, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Donalda to Bawlf Waterline Phase 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work comprises of, but is not limited to the installation and commissioning of approximately 49km of directionally drilled regional water pipeline, along with all appurtenances as is detailed on the SMRWSC Phase 7 - Donalda to Bawlf Waterline Design Drawings, and as specified in the contract documents. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Stettler |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Waste Processing and Treatment, Commercial, Water Supply and Storage |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Wood Buffalo Water Treatment Plant Expansion
- Coca-Cola Centre
- Children's and Women's Clinical Support Building
- Alberta Schools Alternative Procurement Phase 2
- New Central Library & Library Plaza - LRT Encapsulation
