logo
ProjectBid Results

Doncaster Outfall Gate Chamber Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

D3.1 The Work to be done under the Contract shall consist of structural modifications of the existing structure, removal and replacement of the existing slide and flap gates, installation of automation controls, PLC, instrumentation and electrical components D3.2 The major components of the Work are as follows: (a) Partial demolition of the existing gate chamber to facilitate the installation of a

Status
Closed
Sector
Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Power Generation (CCGT)
Location
Winnipeg, Manitoba, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Doncaster Outfall Gate Chamber Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Doncaster Outfall Gate Chamber Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

D3.1 The Work to be done under the Contract shall consist of structural modifications of the existing structure, removal and replacement of the existing slide and flap gates, installation of automation controls, PLC, instrumentation and electrical components D3.2 The major components of the Work are as follows: (a) Partial demolition of the existing gate chamber to facilitate the installation of a new slide gate; (b) Removal of the existing gates, including their thimbles; (c) Downstream exte...

Procurement method

Budget

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Power Generation (CCGT)

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project