logo

Donetsk District Heating Project

Sector: Water Supply and Storage • Location: Ukraine

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

Translated version of this PSD: Ukrainian The EBRD is considering providing a loan to municipal district heating utility “Donetskmiskteplomerezha” (the “Company”) operating in the City of Donetsk to finance installation of individual sub-stations, network replacement with pre-insulated pipes, modernisation of boilers and control systems, installation of new gas engine units for simultaneous co-gen

Project Information FAQ

Project Information

4 Q
The project “Donetsk District Heating Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Ukrainian The EBRD is considering providing a loan to municipal district heating utility “Donetskmiskteplomerezha” (the “Company”) operating in the City of Donetsk to finance installation of individual sub-stations, network replacement with pre-insulated pipes, modernisation of boilers and control systems, installation of new gas engine units for simultaneous co-generation of heat and electricity, installation of dispatching and monitoring system. The project aims at significantly improving the energy efficiency, reducing energy losses, gas and electricity consumption and improving the quality of heat and hot water supply services in the City. The Project is part of an Integrated Approach to Reform in the Ukrainian District Heating Sector that sets out specific transition objectives for the sector which, by their nature, would benefit from a multi-project and strategic approach, to create a synergy between priority investments, technical cooperation, and sector policy dialogue. The transition impact of the project is expected to derive from: Communal Commercial Enterprise “Donetskmiskteplomerezha”, a municipal district heating utility wholly owned by the City of Donetsk. EUR 15 million loan to the Company, secured by a municipal guarantee. Up to EUR 26.5 million. The project is expected to be co-financed by a loan of up to EUR 4 million from Nordic Environment Finance Corporation (NEFCO) and a grant of up to EUR 7.5 million from the Eastern Europe Energy Efficiency and Environment Partnership (E5P). The project has been categorised B in accordance with EBRD's 2008 Environmental and Social Policy. The priority investments into the rehabilitation and modernisation of the district heating infrastructure are expected to bring environmental and social benefits associated with the overall improvement in the quality of heating and hot water services in the City, improved energy efficiency, reduction in fuel consumption and heat and water losses, and lower air emissions. The due diligence is currently being finalised. It includes a corporate review of the Company’s corporate environmental, health and safety and social management capabilities and procedures in relation to its own workforce and construction contractors, and an analysis of the environmental and social impacts and benefits of the proposed priority investment programme to establish the level of project's compliance with EBRD's Performance Requirements (PRs). There were no major issues identified and any adverse impacts are expected to be limited to short-term environmental, health and safety issues arising from construction works which can be adequately mitigated by taking environmental protection measures into consideration in construction planning and work practices. Particular attention needs to be paid to conducting an asbestos survey and developing and enforcing implementation of strict procedures for handling and removal of asbestos-containing materials. An Environmental and Social Action Plan (ESAP), containing mitigation measures for identified issues along with a framework for provision of information to stakeholdershave been developed and are currently being reviewed by the Company. The Company will need to implement the ESAP, provide timely information to stakeholders affected by the Project and submit annual environmental and social reports to the Bank. Pre-signing: Post-signing:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data