Donghae Port Phase 3 (Zone-1) Breakwater Coastal Structure Construction Project

Sector: Seaport • Location: South Korea

Source: Hyundai Engineering

Project
Closed

Donghae Port has served as a hub for northern trade and logistics in Northeast Asia since its opening in 1979. As the volume of goods to be handled increased, the three-phase development project of Donghae Port was carried out to smoothly manage congested ships and commodities and strengthen the port’s competitiveness as an international trade port. Among the Phase 3 of construction consisting of

Project Information FAQ

Project Information

4 Q
The project “Donghae Port Phase 3 (Zone-1) Breakwater Coastal Structure Construction Project” is an infrastructure initiative in the Seaport sector, located in South Korea. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Donghae Port has served as a hub for northern trade and logistics in Northeast Asia since its opening in 1979. As the volume of goods to be handled increased, the three-phase development project of Donghae Port was carried out to smoothly manage congested ships and commodities and strengthen the port’s competitiveness as an international trade port. Among the Phase 3 of construction consisting of the northern breakwater and the breakwater revetment, Hyundai E&C was in charge of constructing a breakwater revetment(zone 1) and constructed 150m Eastern breakwater, 539m breakwater revetment, 759m waterfront revetment, and 1 auxiliary construction.The most important thing in the breakwater and breakwater revetment construction is to secure the “harbor tranquility,” which refers to the stable state of the sea level in the port and to prevent wave overtopping where the seawater flows over the floor of the breakwater. Based on the analysis results and experiments such as the flow of waves in nearby waters and the direction of waves due to surrounding facilities, the site applied a 100-year frequency design wave and a design of floor height significantly raised to a maximum of DL (+) of 14.5m. In addition, the site overcame risks with a three-phase customized reinforcement plan in a limestone cavity irregularly distributed in the original ground and secured safety and durability through detailed analysis and further review.An optimal design was also applied to maximize the functionality of the facility. In front of the breakwater caisson, the form of rubble mound with the best hydraulic characteristics was adopted, and a 70-ton cover of sofa block and an open slit caisson to all sections of the breakwater and breakwater revetment were applied. Moreover, a three-sided open slit caisson was used for the breakwater head. In particular, inside the breakwater revetment, a five-stage breakwater floor-mounted design was introduced, completely blocking the waves and strengthening the core function of the breakwater revetment while adding to its aesthetic appearance.[ Port tranquility was secured by applying a three-sided open slit caisson at the head of the breakwater. ][ A five-stage half-wave upper design was adopted to completely block the wave overtopping in the breakwater revetment. ]As it was a large-scale port construction project across the east coast, high waves and climate change were the biggest issues. There was a time when a typhoon, which hit two or three times a year, swept away all the ripraps and armor stones worked on for three to four months, which left the site devastated. However, the site workers quickly completed the rubble mound breakwater by deploying marine equipment early, and the caisson was also worked on several months earlier while damage recovery work was strategically performed to minimize delay in the process.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data