logo

Donimalai Project for regularisation of Outide Infrastrecture Area

Sector: Road • Location: Ballari, Karnataka, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Information National Mineral Development Corporation Limited [NMDC] has come up with Donimalai Project for regularisation of Outide Infrastrecture Area with a ticket size of 295.78 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Donimalai Iron Ore Mine of

Project Information FAQ

Project Information

5 Q
The project “Donimalai Project for regularisation of Outide Infrastrecture Area” is an infrastructure initiative in the Road sector, located in Ballari, Karnataka, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information National Mineral Development Corporation Limited [NMDC] has come up with Donimalai Project for regularisation of Outide Infrastrecture Area with a ticket size of 295.78 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Donimalai Iron Ore Mine of NMDC Ltd. M.L.No.2396, commenced its mining operations in 1977 before the enactment of FC Act 1980. To support the beneficiation and processing of iron ore extracted from the mine, various ancillary infrastructures covering an area of 96.868 hectares were established outside the mining lease. These infrastructures are interlocked with forest patches of 138.778 Ha. Stage-1 Forest Clearance was obtained from the Ministry of Environment, Forest and Climate Change on 21.11.2023 for 96.868 Ha, instead of 235.648 Ha excluding the interlocked area between the infrastructure patches.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data