Doran Street Infrastructure Improvements
Sector: Water Supply and Storage • Location: Petawawa, Ontario, Canada
Source: Dodge USA
Doran Street Infrastructure Improvements from Petawawa Boulevard to Murphy Road (1.0 km) including spot repairs to the sanitary sewer system utilizing open cut excavation or trenchless technologies and watermain improvements including new hydrants, water valves and restorations.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Tunnel, Commercial, Power Generation (CCGT)
- Location
- Petawawa, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Doran Street Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Doran Street Infrastructure Improvements from Petawawa Boulevard to Murphy Road (1.0 km) including spot repairs to the sanitary sewer system utilizing open cut excavation or trenchless technologies and watermain improvements including new hydrants, water valves and restorations. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Petawawa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Tunnel, Commercial, Power Generation (CCGT) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
