Dorra Gas Field Development Project
The owner, status and timeline of this project. A free account opens every field.
Source: PE Media Network
The Dorra gas project is a joint development by Saudi Arabia and Kuwait through Al-Khafji Joint Operations (KJO), aiming to produce 1 billion cubic feet per day of gas and 84,000 barrels per day of condensate. The field holds an estimated 20 trillion cubic feet of gas and 310 million barrels of oil. The project has faced delays due to Iranian objections regarding territorial claims.
- Status
- Prospective
- Sector
- Oil and Gas, LNG, Residential
- Location
- Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- PE Media Network
ConstructChat
Ask ConstructChat about Dorra Gas Field Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dorra gas project is a joint development by Saudi Arabia and Kuwait through Al-Khafji Joint Operations (KJO), aiming to produce 1 billion cubic feet per day of gas and 84,000 barrels per day of condensate. The field holds an estimated 20 trillion cubic feet of gas and 310 million barrels of oil. The project has faced delays due to Iranian objections regarding territorial claims. |
Original sector | Energy |
Location
Country | Saudi Arabia |
Source
Source | PE Media Network |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, LNG, Residential |
Article published date | 2025-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
