Doty Road Concrete Culvert Install
Sector: Water Supply and Storage • Location: Wanaque, New Jersey, United States of America
Source: Dodge USA
The Project includes replacement of the existing bridge (Structure No. 1600-147) on Doty Road over Post Brook with precast concrete culvert (3-sided frame) and improvements to the approach roadway. Steel 4 bar Bridge Railing will be installed on the structure in accordance with the current NJDOT Bridge Construction Standards.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project includes replacement of the existing bridge (Structure No. 1600-147) on Doty Road over Post Brook with precast concrete culvert (3-sided frame) and improvements to the approach roadway. Steel 4 bar Bridge Railing will be installed on the structure in accordance with the current NJDOT Bridge Construction Standards. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
