logo

Douala Urban Mobility Project in Cameroon

Sector: Solar • Location: Centre, Cameroon

Source: InfraPPPWorld

Project
Project In Tender

The project involves the Development work on the four sections of urban feeder roads of the pilot corridor of Bus Rapid Transit (BRT) in the City of Douala (12.594 km), Republic of Cameroon.The scope of work consists of the following services: The installation of the site, and the bringing and removal of the site equipment; The execution studies and production of documents; The various demolitions

Project Information FAQ

Project Information

4 Q
The project “Douala Urban Mobility Project in Cameroon” is an infrastructure initiative in the Solar sector, located in Centre, Cameroon. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the Development work on the four sections of urban feeder roads of the pilot corridor of Bus Rapid Transit (BRT) in the City of Douala (12.594 km), Republic of Cameroon.The scope of work consists of the following services: The installation of the site, and the bringing and removal of the site equipment; The execution studies and production of documents; The various demolitions; the relocation of various networks; The general earthworks and the construction of a roadway with stopping strips according to the development plan; The construction of sidewalks; the installation of curbs; the construction of gutters; the construction of concrete platforms to serve as receptacles for household waste bins according to the plan; the construction of public benches; the construction of bus shelters; the installation of a public lighting network operating from solar sources; the installation of traffic lights; The completion of horizontal and vertical signaling works; The planting of shrubs on the TPC, around taxi stops and other species in the marshy area; As well as all measures to limit environmental and social impacts and prevent STIs and HIV/AIDS.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data