Double Arches Solar Array
Planned · United Kingdom · Last reported May 2025
Source: Luton Today
A 2.54MW solar array project by AWGroup at Double Arches, generating enough electricity annually to power over 600 homes and charge over 50,000 electric cars. The project benefits from a new rule change that speeds up grid connections for projects under 5MW by removing the requirement for a full Transmission Impact Assessment.
- Status
- Prospective
- Sector
- Automotive, Power Generation (CCGT), Solar
- Location
- Leighton Buzzard, United Kingdom
- Updated
- 19 Nov 2026
- Source
- Luton Today
ConstructChat
Ask ConstructChat about Double Arches Solar Array
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A 2.54MW solar array project by AWGroup at Double Arches, generating enough electricity annually to power over 600 homes and charge over 50,000 electric cars. The project benefits from a new rule change that speeds up grid connections for projects under 5MW by removing the requirement for a full Transmission Impact Assessment. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
City | Leighton Buzzard |
Source
Source | Luton Today |
URL |
More Details
Record type | Project |
Sector | Automotive, Power Generation (CCGT), Solar |
Article published date | 2025-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
