Double Bayou Fy 25 Maintenance Dredging SOURCES SOUGHT
Closed · Texas · Last reported Dec 2024
Source: Dodge USA
Project Information: Maintenance pipeline dredging, shallow draft of the Double Bayou Channel, -50+00 to 206+50 and 206+50 to 311.25 . Estimated 122,000 CY of material to be placed in open water placement areas. Placement of material will be spread throughout 11 open water Placement Areas.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Manufacturing (Industrial)
- Location
- Beach City, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Double Bayou Fy 25 Maintenance Dredging SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Information: Maintenance pipeline dredging, shallow draft of the Double Bayou Channel, -50+00 to 206+50 and 206+50 to 311.25 . Estimated 122,000 CY of material to be placed in open water placement areas. Placement of material will be spread throughout 11 open water Placement Areas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Beach City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
