logo

Double Circuit 330/132kV Transmission Lines Construction

Sector: Power Generation (CCGT) • Location: Maiduguri, Borno State, Nigeria

Source: The Guardian Nigeria News

Project
Planned

Construction of additional Double Circuit 330/132kV transmission lines to reinforce power supply to the Northeast region of Nigeria.

Status
Prospective
Sector
Power Generation (CCGT)
Location
Maiduguri, Borno State, Nigeria
Updated
22 Jul 2026
Source
The Guardian Nigeria News

ConstructChat

Ask ConstructChat about Double Circuit 330/132kV Transmission Lines Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Double Circuit 330/132kV Transmission Lines Construction” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maiduguri, Borno State, Nigeria. Taiyo aggregates data on it from The Guardian Nigeria News.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of additional Double Circuit 330/132kV transmission lines to reinforce power supply to the Northeast region of Nigeria.

Original sector

Energy

Location

Country

Nigeria

State

Borno State

City

Maiduguri

Source

Source

The Guardian Nigeria News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project